The kitchen that is.
SFC spent three days removing the tiles.
They were stuck on with glue to a plywood base so needed a lot of work to remove.
Now it's my turn.
Have to level it off well, cut the tiles and place them then do the grouting.
In a few days it'll be done.
I don't much care for tiling.
Especially when we'll be leaving soon and not even get to enjoy the results much.
Oh well.