Time to tile
Posted: Thu Jan 09, 2014 9:02 pm
The kitchen that is.
SFC spent three days removing the tiles.
They were stuck on with glue to a plywood base so needed a lot of work to remove.
Now it's my turn.
Have to level it off well, cut the tiles and place them then do the grouting.
In a few days it'll be done.
I don't much care for tiling.
Especially when we'll be leaving soon and not even get to enjoy the results much.
Oh well.
SFC spent three days removing the tiles.
They were stuck on with glue to a plywood base so needed a lot of work to remove.
Now it's my turn.
Have to level it off well, cut the tiles and place them then do the grouting.
In a few days it'll be done.
I don't much care for tiling.
Especially when we'll be leaving soon and not even get to enjoy the results much.
Oh well.